Resource Library

Recently added resources

  • One of the key conditions for MEWP stability is the ability of the ground or structure to safely support the weight of the MEWP at its point of contact with the ground in all configurations. Failure to consider the load-bearing capacity of the ground could potentially cause the MEWP to go out of level, become unstable, and overturn.

    Added 17 Mar 2025
    Last updated 17 Mar 2025

    Resource also available in:

  • JOYCE GÖTTGENS-KEIJBETS
    PLANNER, COLLE RENTAL & SALES, NETHERLANDS

    Added 5 Mar 2025
    Last updated 5 Mar 2025

    Resource also available in:

  • Do you have a rescue plan? Always plan for a safe rescue.

    Added 21 Jan 2025
    Last updated

    Resource also available in:

    Andy Access Poster A4

All resources

Show filters
  • Setting up on a slope? Outriggers and spreader pads must be on level and stable ground.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Prevent unauthorized use. After use, always leave the MEWP in a safe and secure place and remove the key.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Keep clear of cables. You do not need to touch the power cables to be electrocuted – electricity can jump!

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Overhead obstructions. Always be aware of your surroundings and identify crush hazards when moving the platform.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Register pre-owned MEWPs. Make sure you register with the MEWP manufacturer to get safety alerts and product updates.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Correct MEWP selection. Always use the right MEWP for the job

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Don't overload the Platform. Always respect the load chart and follow the manufacturer’s guidance for its intended use.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Do not interfere with ties. A mast climbing work platform (MCWP) needs all of the ties for stability.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Beware of falling objects. Organize a drop zone clear of the MEWP base.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Unsafe ground? Always check ground conditions – plan your route.

    Added 1 Jan 2018
    Last updated

    Resource also available in:

  • Caution when loading and unloading. Always load and unload MEWPs safely.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Never attach banners to MEWPs. Always remember a banner can act like a sail.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • Don't use a MEWP as a crane! Lifting objects can overload or damage the MEWP and cause it to overturn.

    Added 1 Jan 2018
    Last updated 6 Nov 2024

    Resource also available in:

  • It is the employer's responsibility to ensure that all operators they direct and authorize to use aerial equipment are adequately trained, familiarized and made aware of operator responsibilities to comply with current health and safety requirements.

    Added 1 Jan 2018
    Last updated

    Resource also available in:

  • Publication

    Access International

    Access International is the official magazine of IPAF.

    Added 1 Jan 2018
    Last updated 8 Nov 2024

    Resource also available in:

  • The mounting or re-mounting of a Mobile Elevating Work Platform (MEWP) onto a new or different vehicle chassis to the original chassis as sold by the MEWP manufacturer is a specialist job requiring both in-depth engineering knowledge and the technical specifications for the MEWP to be mounted.

    Added 1 Jan 2018
    Last updated 1 Jan 2018

    Resource also available in:

  • Mobile elevating work platforms (MEWPs) are specifically designed to lift people to a position where they can work at height safely within the platform.

    Added 1 Jan 2018
    Last updated

    Resource also available in:

  • Publication

    Raising the Standard

    Raising the Standard is the IPAF bulletin. It is published twice a year and carries news of particular interest to IPAF members, such as developments in legislation and technical standards, and new member services.

    Added 1 Jan 2018
    Last updated 1 Jan 2018

    Resource also available in:

  • The loading and unloading of mobile elevating work platforms (MEWPs) is potentially a high risk activity, as findings from the IPAF accident reporting database (www.ipaf.org/accident) show. This document outlines the importance of planning and managing the delivery and collection operations.

    Added 1 May 2016
    Last updated

    Resource also available in: